Works Program

Primavera P6 for Industrial and Shutdown Projects

Master complex schedules, shutdown windows, and project controls for oil and gas delivery.

Enroll Now ₹21,999.00 30 days · 12 lectures
Works Program Works Program
950+
Hindi & English
12 lectures
Primavera P6 for Industrial and Shutdown Projects

What you will learn

✔ Primavera P6 Interface & Project Setup
✔ Industrial Project Planning Fundamentals
✔ Work Breakdown Structure (WBS) Development
✔ Activity Creation & Sequencing
✔ Scheduling Logic & Relationships
✔ Critical Path Method (CPM)
✔ Resource Loading & Resource Levelling
✔ Baseline Development & Management
✔ Progress Updating & Tracking
✔ Schedule Performance Analysis
✔ Delay Analysis & Recovery Planning
✔ Shutdown & Turnaround Planning
✔ Resource Histograms & S-Curves
✔ Project Controls & Reporting
✔ Industrial Project Scheduling
✔ Real-World Shutdown Project Planning

Course Description

The Primavera P6 for Industrial & Shutdown Projects Certification Program is a practical industry-focused training course designed to develop expertise in project planning and controls for industrial, refinery, petrochemical, power plant, manufacturing, and shutdown environments.

Participants will learn how to create and manage project schedules, develop work breakdown structures, establish project baselines, allocate resources, monitor progress, perform delay analysis, and generate management reports using Primavera P6. Special emphasis is placed on shutdown and turnaround planning, where effective scheduling and resource coordination are critical to project success.

By the end of the program, learners will be able to independently develop, monitor, and control industrial project schedules while supporting project controls and planning functions in EPC, Oil & Gas, Petrochemical, and Industrial sectors.

Frequently asked questions

What will I learn in Primavera P6 for Industrial and Shutdown Projects?

✔ Primavera P6 Interface & Project Setup ✔ Industrial Project Planning Fundamentals ✔ Work Breakdown Structure (WBS) Development ✔ Activity Creation & Sequencing ✔ Scheduling Logic & Relationships ✔ Critical Path Method (CPM) ✔ Resource Loading & Resource Levelling ✔ Baseline Development & Management ✔ Progress Updating & Tracking ✔ Schedule Performance Analysis ✔ Delay Analysis & Recovery Planning ✔ Shutdown & Turnaround Planning ✔ Resource Histograms & S-Curves ✔ Project Controls & Reporting ✔ Industrial Project Scheduling ✔ Real-World Shutdown Project Planning

Who is this course for?

✔ Planning Engineers ✔ Project Engineers ✔ Mechanical Engineers ✔ Civil Engineers ✔ Electrical Engineers ✔ Project Controls Engineers ✔ Shutdown & Turnaround Planners ✔ Construction Managers ✔ Oil & Gas Professionals ✔ Petrochemical & Refinery Engineers ✔ Power Plant Professionals ✔ Engineering Students & Fresh Graduates ✔ Working Professionals Seeking Planning Roles

Are there any prerequisites?

✔ Basic Computer Knowledge ✔ Laptop/Desktop with Primavera P6 Installed ✔ Basic Understanding of Construction or Industrial Projects ✔ Engineering Background (Preferred) ✔ No Prior Primavera Experience Required

How long is the course?

30 days

Requirements

  • ✔ Basic Computer Knowledge
  • ✔ Laptop/Desktop with Primavera P6 Installed
  • ✔ Basic Understanding of Construction or Industrial Projects
  • ✔ Engineering Background (Preferred)
  • ✔ No Prior Primavera Experience Required

This course is made for

  • ✔ Planning Engineers
  • ✔ Project Engineers
  • ✔ Mechanical Engineers
  • ✔ Civil Engineers
  • ✔ Electrical Engineers
  • ✔ Project Controls Engineers
  • ✔ Shutdown & Turnaround Planners
  • ✔ Construction Managers
  • ✔ Oil & Gas Professionals
  • ✔ Petrochemical & Refinery Engineers
  • ✔ Power Plant Professionals
  • ✔ Engineering Students & Fresh Graduates
  • ✔ Working Professionals Seeking Planning Roles